Strata Linings developed an innovative system of containing five Longwall blocks of mine water. The Project involved placing monolithic foamed concrete bulkheads between Gateroad pillars, to act as a consolidated barrier pillar. This procedure removes the necessity of using a ‘coal’ barrier pillar and driving two new Gateroads in the adjacent Longwall Block.
The installed bulkheads are subjected to:
- 30 metres of static water head pressure, once the sealed goaf is at its maximum expected water level; and
- A large increase in additional vertical compression after longwall extraction.